Skip to product information
1 of 12

Clevakid

Stainless Steel Water Bottle Purple Light Powder- 350ML\12 OZ - Clevapirouette Friend

Stainless Steel Water Bottle Purple Light Powder- 350ML\12 OZ - Clevapirouette Friend

Quantity
View full details
  • BPA Free

  • Kid Friendly

  • Easy To Clean

  • Safe Material

Little bottle,
big adventures

Watch how the ClevaKid Stainless Steel Water Bottle makes everyday hydration easy, fun and mess-free.

Designed for active days and everyday hydration, the ClevaKid Stainless Steel Water Bottle keeps drinks at the perfect temperature wherever the day goes.

With double-wall vacuum insulation, a leakproof straw lid, and a lightweight portable design, it’s ideal for school, sports, travel and everyday use.

  • Double-wall vacuum insulated
  • Leakproof straw lid
  • BPA-free reusable straw
  • Wide mouth for ice cubes & easy cleaning
  • Anti-slip silicone bottom
  • Includes 2 straws + cleaning brush
▣
Capacity 350ML | 12 OZ
◉
Material Food-Grade Stainless Steel
❄
Cold Up to 12 Hours
♨
Hot Up to 6 Hours
✓
Leakproof Silicone Seal
↔
Wide Mouth Fits Ice Cubes
Premium Stainless Steel

Crafted from high-quality food-grade stainless steel for long-lasting durability, safety and everyday performance.

Double-Wall Vacuum Insulation

Keeps drinks cold for up to 12 hours or hot for up to 6 hours, making it suitable for year-round use.

Leakproof Straw Lid

The closeable insulated straw lid includes a silicone sealing ring to help prevent spills inside backpacks and travel bags.

BPA-Free Reusable Straw

Includes a kid-safe reusable straw designed for easy, comfortable drinking.

Wide Mouth Opening

Makes refilling and cleaning easier and fits standard ice cubes.

Anti-Slip Silicone Bottom

Adds grip and stability while helping reduce noise when placing the bottle on hard surfaces.

Lightweight & Travel-Ready

Easy to carry and designed to fit most car cup holders, school bags and travel setups.

Bonus Accessories Included

Each bottle includes two reusable straws and a cleaning brush for convenient maintenance.

Capacity 350ML | 12 OZ
Material Food-Grade Stainless Steel
Insulation Double-Wall Vacuum
Cold Retention Up to 12 Hours
Hot Retention Up to 6 Hours
Lid Leakproof Straw Lid
Seal Silicone Sealing Ring
Straw BPA-Free Reusable Straw
Bottom Anti-Slip Silicone
Included Accessories 2 Straws + Cleaning Brush
Dishwasher Safe No
Cleaning Hand Wash Only
  • Hand wash all bottle parts only.
  • Do not place the bottle or lid in the dishwasher.
  • Use the included cleaning brush to clean the reusable straws.
  • Wash the silicone sealing ring regularly to maintain the leakproof seal.
  • Allow all components to dry completely before reassembling.
  • Do not use abrasive cleaners or harsh scrubbing pads.
  • Clean the bottle after each use, especially after milk or flavored drinks.