
Little bottle,
big adventures
Watch how the ClevaKid Stainless Steel Water Bottle makes everyday hydration easy, fun and mess-free.
Designed for active days and everyday hydration, the ClevaKid Stainless Steel Water Bottle keeps drinks at the perfect temperature wherever the day goes.
With double-wall vacuum insulation, a leakproof straw lid, and a lightweight portable design, it’s ideal for school, sports, travel and everyday use.
- Double-wall vacuum insulated
- Leakproof straw lid
- BPA-free reusable straw
- Wide mouth for ice cubes & easy cleaning
- Anti-slip silicone bottom
- Includes 2 straws + cleaning brush
Crafted from high-quality food-grade stainless steel for long-lasting durability, safety and everyday performance.
Keeps drinks cold for up to 12 hours or hot for up to 6 hours, making it suitable for year-round use.
The closeable insulated straw lid includes a silicone sealing ring to help prevent spills inside backpacks and travel bags.
Includes a kid-safe reusable straw designed for easy, comfortable drinking.
Makes refilling and cleaning easier and fits standard ice cubes.
Adds grip and stability while helping reduce noise when placing the bottle on hard surfaces.
Easy to carry and designed to fit most car cup holders, school bags and travel setups.
Each bottle includes two reusable straws and a cleaning brush for convenient maintenance.
- Hand wash all bottle parts only.
- Do not place the bottle or lid in the dishwasher.
- Use the included cleaning brush to clean the reusable straws.
- Wash the silicone sealing ring regularly to maintain the leakproof seal.
- Allow all components to dry completely before reassembling.
- Do not use abrasive cleaners or harsh scrubbing pads.
- Clean the bottle after each use, especially after milk or flavored drinks.